Sungrow has supplied PowerTitan 2.0 units, with KSBR handling construction toward end-2026 operation. Image Credit/Source: Nala Renewables  
Europe

Nala begins construction of 50 MW/100 MWh BESS project in Finland

Team BESSNews

Nala Renewables, headquartered in Singapore, has started construction of a 50 MW/100 MWh battery energy storage system in Kauhava, Finland. It is the company’s first BESS installation in the country. 

The project is being delivered by Sungrow and KSBR, with long-term financing provided by Societe Generale. Sungrow will supply twenty-two 5MWh units from its PowerTitan 2.0 BESS platform and is coordinating technical integration, operational support, and lifecycle management for the system, while KSBR is responsible for construction works at the site. The system is expected to reach operational status by the end of 2026. 

Trafigura, will utilize the BESS capacity for its European trading activities once the system reaches full operation. Nala Renewables is a joint venture between Trafigura and funds managed by IFM Investors. 

Mike O’Neill, Chief Executive Officer of Nala Renewables, said the Kauhava project is Nala Renewables’ first BESS development in Finland and shows its focus on Europe’s storage market. He noted that Trafigura plans to use the system in line with Finland’s grid and reserve market needs and added that the project includes grid-forming features to support network stability. 

Sungrow deploys AI-enabled VPP at The Gibraltar Bowral

Anza Power signs Amazon deal for 50 MW Bairnsdale BESS

JA Solar launches its first European roadshow in Poland

ENGIE adds 1.1 GW/3.3 GWh to European battery portfolio

Trina Storage to Launch Elementa + Electra at MEE 2026