Groundbreaking at the site of the Voltwise battery in Leopoldshöhe. (Image Source: Vattenfall)
Projects

Vattenfall to market 125 MWh Voltwise BESS in Germany

Karthik S Gannavaram

Executive summary

A trading partner has been found for the first large battery of Voltwise in Germany before its construction has begun. The 56 MW and 125 MWh plant at Leopoldshöhe, near Bielefeld, is to be optimised and marketed by Vattenfall for five years, a period which is to start with its commissioning in the second half of 2027.

  • Capacity: 56 MW / 125 MWh

  • Location: Leopoldshöhe, Germany

  • Developer: Voltwise

  • Optimiser: Vattenfall

  • Contract term: Five years

  • Trading desk: Hamburg

  • Planned commissioning: 2027

Vattenfall, a Sweden-based energy company, has been chosen by Voltwise to optimise and market its battery at Leopoldshöhe, near Bielefeld in Germany. The plant is of 56 MW and 125 MWh. It is the first large battery of Voltwise in the country, and it is to be built over the coming months, as was stated by Vattenfall Germany on 23 November.

Under the contract, the whole storage capacity of the plant is to be made available to Vattenfall for five years. That period is to begin with the planned commissioning of the battery in the second half of 2027. Throughout it, the plant is to be optimised and marketed on the power market by the energy trading arm of Vattenfall in Hamburg.

We integrate the battery into our automated trading processes. This allows us to offer flexibility where it creates the greatest benefit, whether in short-term day-ahead and intraday trading or in the balancing energy market for grid stabilisation.
Björn Schneegans, Head of Origination of Vattenfall

For Voltwise, the project has been described as the start of a series of further plants in Germany. The developer was founded in 2023 and has its head office in London, while its German business is run from Munich, and its core markets are Germany and the United Kingdom. It is held in the portfolio of the investment firm Sandbrook Capital, and in January a financing of GBP 154 million had been secured by Voltwise Power for its BESS portfolio in the United Kingdom.

We are pleased to have an experienced partner at our side in Vattenfall, one that will position our first large battery in Germany optimally in the market. Together, we are making an important contribution to security of supply and to the decarbonisation of the energy system.
John D. Jones, Chief Executive Officer of Voltwise

Such flexibility is being sought more and more in Germany, where the growing share of weather-dependent renewables has made both output and prices less steady. In winter, the still and dark spells known as Dunkelflaute have caused price spikes, while in summer a surplus of solar output has led to negative prices more often. For Vattenfall, the Leopoldshöhe battery is to be added to the 1.3 GW of storage power which the company has in operation, planning and development. In October, its 254 MW Brunsbüttel BESS, with over 1,000 MWh of storage, had been awarded to Fluence, and that plant is to be in operation by the end of 2028.

Entech to build 135 MWh battery for Voltalia in French Guiana

HEXA receives financing for 90 MW (AC) BESS projects in Japan

InCommodities signs seven-year deal for 250 MWh Finnish BESS

Peak Energy lifts Series B to $157 million for sodium-ion BESS

L&T wins 300 MW/900 MWh liquid-cooled BESS order at Khavda