The Ministry of Heavy Industries has reported participation from 22 companies in its 10 GWh ACC battery manufacturing capacity allocation. The initiative is part of India's 50 GWh ACC manufacturing programme and is intended to support grid-scale storage requirements arising from renewable energy expansion
Snapshot
Country: India
Ministry: Ministry of Heavy Industries (MHI)
Bids received: 22
Capacity offered: 10 GWh
Programme: PLI Scheme
Targeted overall capacity: 50 GWh
Application: Grid-Scale Stationary Storage (GSSS)
Announcement date: 12 November 2026
The Ministry of Heavy Industries (MHI) has received 22 bids for 10 GWh of ACC battery manufacturing capacity, earmarked for Grid-Scale Stationary Storage (GSSS) applications. The scheme aims to establish domestic ACC manufacturing capacity and support the country’s growing energy storage requirements.
Earlier, India's MHI floated the global tender (ID 2026_DFIN_910329_1) on the CPP Portal on 15 July 2026. A pre-bid conference held in New Delhi on 29 July with the bid deadline, first set for 13 October, closed on 10 November. The bids are judged by two-stage quality and cost based selection.
Technical bids were opened on 11 November 2026, a day after the deadline on the CPP Portal. The scheme, approved in May 2021 with an outlay of INR 18,100 crore, has already awarded 40 GWh of the 50 GWh in two earlier rounds.
India’s Ministry of Heavy Industries (MHI) is responsible for implementing the Production Linked Incentive (PLI) scheme under the National Programme on Advanced Chemistry Cell (ACC) Battery Storage.
The companies submitting bids include Reliance Industries, ACME Solar Holdings, Amara Raja Advanced Cell Technologies, Exide Energy Solutions, JSW Neo Energy, and Vikram Solar. Other participants include Avaada Electro, Fujiyama Power Systems, Megha Engineering and Infrastructures, Waaree Energy Storage Solutions, Godawari New Energy, Renew Photovoltaics, and Sun Drops Energia.
The proposed allocation forms part of the overall targeted 50 GWh ACC manufacturing capacity under the national programme. The ministry has specifically designated this portion for grid-scale stationary storage rather than other battery applications.
MHI said the allocation also aims to strengthen India’s energy security by building domestic ACC manufacturing.